RAFAEL E. AROSEMENA III (Formerly ESSEX)

RAFAEL E. AROSEMENA III (Formerly ESSEX)

This project was comprised by the transformation of an oil barge into a cargo barge on deck for the transport of 4 dumps of 260 tons each. The project was executed in 23 days;

all deck fittings and cargo holds were removed, accessories such as pipes, valves, masts, and access to cargo holds, and 80 tons of steel were installed to reinforce the deck structure before to receiving the dumps.