This ship arrived at the shipyard from Panama for a major repair and maintenance process. 84 tons of steel were replaced, including hard-to-reach sites such as Fore Peak and Engine Room. The work included the revamping of more than 300 meters of piping for different systems,

installation of a winch and desalination plant, underwater and topside painting, change of bushings of the propulsion system and workshop-based repair of tail and rudder shafts, electrical works and overhauling of some sites in the accommodations area.